Can you supply the full pretreatment line?
We can engineer a line section or a complete system based on your process, material and site conditions. The equipment scope is defined for each project.
Industries / Recycling and resource recovery
We engineer crushing, conveying, dosing and dust collection systems for resource recovery and industrial solid waste pretreatment. Tell us about the material and process to define the right equipment scope and line layout.

The right pretreatment train starts with the material's condition and the next process step.
We review the material, required process steps and site conditions before developing the line. Our scope can include equipment we build in our workshop and complementary equipment supplied as part of the line.
Materials and what makes them hard
| Material | The problem | How we handle it |
|---|---|---|
| Ash residues for resource recovery | The pretreatment line may need to reduce size, convey material and control dust between process stages. | We can combine shredders, supplied crushing equipment, conveyors and pulse-jet bag filters according to the process layout. |
| Industrial solid waste | Different feed conditions call for a pretreatment configuration suited to the material and downstream process. | We design the handling sequence around the application, using our workshop-built twin-shaft shredder and suitable conveying and dust collection equipment where required. |
| Agglomerated materials | Material that has formed lumps may need size reduction before conveying, dosing or mixing. | We can include a supplied hammer crusher or roll crusher as part of the line, selected around the process requirements. |
| Ash for washing processes | Bulk solids need to move through the required process stages in a controlled sequence. | We can engineer the conveying, metering and control sections around the process information provided by the customer. |
Equipment
Shredders and supplied crushers reduce material size where the process requires it.
Conveyors move material between receiving, pretreatment and downstream stages.
Dust collection helps manage airborne dust at selected handling and transfer points.
Dosing equipment meters material when the downstream process calls for controlled feed rates or batches.
A typical line
Dust extraction at every transfer point
The actual configuration follows your material, rate and site.
Our experience
Our listed resource recovery work includes five ash residue plants and one ash washing plant. Projects at the ash residue plants include a shredder, a crushing system retrofit and dust collector work in Zhejiang, plus a dust collector project in Guangdong; the listed work also includes ash storage and conveying for a low-temperature pyrolysis line in Zhejiang.
Guangdong, China
Ash recycling plant Dust collector
2025 · In manufacture
Zhejiang, China
Ash recycling plant Shredder
2025 · Delivered
Zhejiang, China
Ash recycling plant Dust collector
2025 · Shipped
Zhejiang, China
Ash recycling plant Ash silos and conveying for a low-temperature pyrolysis line
2025 · In manufacture
Zhejiang, China
Ash recycling plant Crushing system retrofit
2024 · Delivered
Zhejiang, China
Ash washing plant Shredder
2024 · Delivered
Questions buyers ask
We can engineer a line section or a complete system based on your process, material and site conditions. The equipment scope is defined for each project.
We manufacture twin-shaft shredders in our workshop. Hammer crushers and roll crushers are supplied as part of a line.
We handle retrofit engineering, including adding a line beneath existing silos, subject to site and process review.
Next step
Send the material and the process. Our engineers look at it first and come back with a proposed solution and configuration.